Independent SEM dealer construction machines and local support

Contact Us

Call Us

International +33 1 71 90 40 50

Monday to Friday 8am-5:30pm (UTC)

Construction & Infrastructure

SEM construction and infrastructure

Construction & infrastructure

Structure the jobsite from earthmoving to finishing.

Roads, platforms, industrial areas, jobsite access and urban projects require a machine chain able to prepare, move, level and compact with consistency. SEM machines cover the key stages of a jobsite, from clearing and hauling to final surface shaping.

4machine families available
5common jobsite applications
1complete site preparation cycle
SEM machines on an infrastructure jobsite
Earthmoving, loading, leveling, trenching and compaction.

Priority uses

A range built to connect jobsite operations.

01

Earthmoving and clearing

Prepare platforms, clear work areas and move materials according to soil conditions and jobsite phasing.

02

Loading and reclaiming

Feed trucks, stock areas or backfill zones with steady cycles and strong jobsite versatility.

03

Leveling and finishing

Shape roads, shoulders, platforms and internal tracks with precision before compaction.

04

Compaction

Stabilize soil layers, backfill and platforms to create a workable and durable base.

Jobsite productivity

Build a coherent machine chain.

In construction, performance depends as much on the machine sequence as on the model itself. A productive loader, an efficient dozer, a precise motor grader and an adapted compactor help reduce idle time between preparation, shaping and finishing.

  • Wheel loaders for loading, reclaiming, handling and feeding.
  • Track-type tractors for pushing, stripping, clearing and ground preparation.
  • Motor graders for roads, tracks, platforms and surface finishing.
  • Compactors to stabilize soils and secure structural layers.

Selection checkpoints

The right choice depends on real phasing.

  • Soil type, moisture, bearing capacity and compaction need.
  • Travel distances between cut, stockpile and backfill areas.
  • Expected precision on platforms, roads or shoulders.
  • Machine, parts and support availability during critical phases.

Applicable Model of SEM Products

  • Wheel loaders
  • Compactors
  • Motor graders
SEM™ 618D
SEM Wheel loaders

618D

Nominal Payload1,800 kg Operating weight in operation5,940 kg Bucket capacity0.9 - 1.0 m³
Explore
SEM™ 512
SEM Compactors

512

Standard Gross Power97.5 kW Rated speed2,200 rpm Inside drum edge turning radius5,990 mm
Explore
SEM™ 520
SEM Compactors

520

Standard Gross Power129 kW Rated speed2,000 rpm Inside drum edge turning radius6,350 mm
Explore
SEM™ 522
SEM Compactors

522

Standard Gross Power140 kW Rated speed2,000 rpm Inside drum edge turning radius6,350 mm
Explore
SEM™ 917F
SEM Motor graders

917F

Operating Weight13,500 kg Minimum turning radius7,300 mm Wheelbase5,830 mm
Explore

Selection method

Choose according to phasing, soil and finish level.

01

Read the jobsite

Identify the stages: cut, fill, road, platform, trenching, finishing or compaction.

02

Qualify the soil

Analyze moisture, bearing capacity, grading and expected compaction level.

03

Build the fleet

Combine loader, dozer, grader and compactor according to production priorities.

04

Plan support

Anticipate service, parts and availability to keep critical jobsite phases moving.

Preparing an infrastructure jobsite?

Share your schedule, volumes and soil constraints with your SEM distributor to define the most suitable configuration.

Get in touch with our experts

Find the perfect solution by contacting our dedicated team of specialists. They are fully equipped to assist you in tackling your daily challenges.

Please fill in all the information below so that we can contact you as soon as possible